Civil

Civil:

quarry volumetrics reports
construction documentation
post work brochure, video, stills, social media
as-built video documentation
Point cloud of a stockpile volumetric with end user interface
secure cloud based client storage

cgrs-overview550+acre orthomosaic shot at 150’AGL
compiled from 1300 individual imagesstockpile2-reportfinished volumetrics deliverable in PDF

3d stockpile#2Point cloud

Yuba river high water mark. 75′ AGL UAV. Next image below is this same river. This rail bridge is about 1/2 mile upstream from this image.

Less than one year later the bank lost almost 40′ inland and undercut two piers causing a partial failure. 4k aerial pano to capture scope of project and Yuba River.

high water event caused damage